Purpose (fix): the gate runs on pull requests again, so a PR's green covers the suite #138

Manually merged
terra merged 1 commit from pluto/137-gate-on-prs into main 2026-11-24 09:06:24 +00:00
Member

Purpose (fix): a pull request's CI runs the suite again, so a PR's green covers npm test and a change that breaks the files consuming a fact goes red on the PR instead of on main after landing.

The gate coverage job carried if: github.event_name == 'push' && github.ref == 'refs/heads/main'. This drops that condition and corrects the comment beside it. The workflow's triggers are already push: branches: [main] and pull_request, so the gate now runs on every pull request and on every push to main, and on no branch push.

The Supervisor ruled this on 2026-11-24; Raf may overrule. The private job's identical condition at .github/workflows/ci.yml:851 is untouched: the ruling names the gate only.

The cost is accepted: martha-bwrap has capacity 1 and a gate run takes about 24 minutes, so pull requests queue behind one another.

The proof of the ruling is this pull request's own run: a gate coverage task on a pull_request event.

Refs macula-io/martha#137.

Purpose (fix): a pull request's CI runs the suite again, so a PR's green covers `npm test` and a change that breaks the files consuming a fact goes red on the PR instead of on main after landing. The `gate coverage` job carried `if: github.event_name == 'push' && github.ref == 'refs/heads/main'`. This drops that condition and corrects the comment beside it. The workflow's triggers are already `push: branches: [main]` and `pull_request`, so the gate now runs on every pull request and on every push to main, and on no branch push. The Supervisor ruled this on 2026-11-24; Raf may overrule. The `private` job's identical condition at `.github/workflows/ci.yml:851` is untouched: the ruling names the gate only. The cost is accepted: martha-bwrap has capacity 1 and a gate run takes about 24 minutes, so pull requests queue behind one another. The proof of the ruling is this pull request's own run: a `gate coverage` task on a `pull_request` event. Refs macula-io/martha#137.
The gate runs on pull requests again, so a PR's green covers the suite (martha#137)
All checks were successful
dependency advisories / node in carry_marthas_own_node/try_a_single_executable (pull_request) Successful in 10s
dependency advisories / node in . (pull_request) Successful in 14s
dependency advisories / node in . (container) (pull_request) Has been skipped
dependency advisories / node in carry_marthas_own_node/try_a_single_executable (container) (pull_request) Has been skipped
dependency advisories / node in installer (container) (pull_request) Has been skipped
c4 model / c4-model-1 (pull_request) Successful in 3s
dependency advisories / node in installer (pull_request) Successful in 11s
c4 model / c4-model (pull_request) Successful in 0s
dependency advisories / advisories (pull_request) Successful in 0s
CI / links resolve (pull_request) Successful in 6s
CI / structural floor (pull_request) Successful in 28s
CI / no import cycle (pull_request) Successful in 25s
CI / Martha's names are its own (pull_request) Successful in 30s
CI / the engine drift check bites (pull_request) Successful in 48s
CI / the host drift check bites (pull_request) Successful in 1m4s
CI / the posted text check bites (pull_request) Successful in 11s
CI / the ring reaches the owner on the live run's tmux (pull_request) Successful in 12s
CI / workflows are valid (pull_request) Successful in 16s
CI / installer (pull_request) Successful in 3m47s
CI / nothing private (pull_request) Has been skipped
CI / no test the base passed goes missing (pull_request) Successful in 37s
CI / the pictures change only with the version (pull_request) Successful in 19s
CI / no literal restates a defined value (pull_request) Successful in 1m12s
CI / every check runs in a job (pull_request) Successful in 14s
CI / every job has a timeout (pull_request) Successful in 14s
standalone / standalone Martha runs alone (ubuntu-latest) (pull_request) Successful in 42s
standalone / the pinned Node is nodejs.org's (pull_request) Successful in 16s
CI / the relay loads in the recorded host (pull_request) Successful in 14m36s
CI / the clean-install proof removes its container (pull_request) Successful in 16m18s
CI / gate coverage (pull_request) Successful in 24m12s
1d83122df5
terra manually merged commit 3b4f837473 into main 2026-11-24 09:06:24 +00:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
martha-ai/martha!138
No description provided.