mcl-mail#19, #4: drop the two uncheckable repository links; lint once per main push #20

Manually merged
terra merged 2 commits from vesta/19-4-private-text-double-lint into main 2026-11-23 21:21:28 +00:00
Member

Purpose (defect): check:private names neither of the two lines on this repository's tree — the two documents that pointed at a repository it cannot verify as public

Purpose (cost): one forge push to main produces one lint run, not two

Refs macula-services/mcl-mail#19, macula-services/mcl-mail#4

mcl-mail#19

Reproduced with martha's scanner on a clone at this base: check:private reports a repository that is not public (value withheld) at README.md:133 and apps/guide_mailbox_lifecycle/src/mailbox_status.hrl:2 (the rest of its hits are the martha#105 shorthand class, out of scope here).

  • README.md no longer points at the sponsors tracker for the crew mail that is not built yet. The tracker link was the scan's own "keep the reasoning, drop the link"; a bare macula-sponsors#315 was tested and still hits (the shorthand class), so it goes.
  • mailbox_status.hrl names evoq's guides/bit_flags.md: the owner goes, the name stays — a private repository's name in text is fine; only secrets and private content hold.

Verified: node src/check_nothing_private_gets_in/main.ts --root <this tree> (martha at main) → no "a repository that is not public" hit; neither line is named.

mcl-mail#4

The issue offers two routes. Gating test the way its siblings are gated is not available: hand-lock has needs: test, if: success(), and reads needs.test.outputs.lock/digest; a skipped test on the forge makes success() false, so hand-lock never runs, the tested rebar.lock is never filed, and host00's signer has nothing to fetch for the tag.

So: lint.yml drops its own push: branches: [main]. build-push.yml's test job calls it on every push to main and every v* tag, so every main push still lints exactly once, hand-lock keeps its lock, and pull requests still lint through lint.yml's pull_request trigger. On GitHub the same change removes the redundant second run; nothing GitHub relied on disappears.

Verified: actionlint clean on lint.yml and build-push.yml.

Not touched

No version, no CHANGELOG release section, no release files — Hygiea's 0.6.2 release run is in flight beside this.

## Purpose (defect): `check:private` names neither of the two lines on this repository's tree — the two documents that pointed at a repository it cannot verify as public ## Purpose (cost): one forge push to main produces one lint run, not two Refs macula-services/mcl-mail#19, macula-services/mcl-mail#4 ### mcl-mail#19 Reproduced with martha's scanner on a clone at this base: `check:private` reports `a repository that is not public (value withheld)` at `README.md:133` and `apps/guide_mailbox_lifecycle/src/mailbox_status.hrl:2` (the rest of its hits are the martha#105 shorthand class, out of scope here). - `README.md` no longer points at the sponsors tracker for the crew mail that is not built yet. The tracker link was the scan's own "keep the reasoning, drop the link"; a bare `macula-sponsors#315` was tested and still hits (the shorthand class), so it goes. - `mailbox_status.hrl` names `evoq's guides/bit_flags.md`: the owner goes, the name stays — a private repository's name in text is fine; only secrets and private content hold. **Verified:** `node src/check_nothing_private_gets_in/main.ts --root <this tree>` (martha at main) → no "a repository that is not public" hit; neither line is named. ### mcl-mail#4 The issue offers two routes. Gating `test` the way its siblings are gated is not available: `hand-lock` has `needs: test`, `if: success()`, and reads `needs.test.outputs.lock`/`digest`; a skipped test on the forge makes `success()` false, so hand-lock never runs, the tested `rebar.lock` is never filed, and host00's signer has nothing to fetch for the tag. So: `lint.yml` drops its own `push: branches: [main]`. `build-push.yml`'s `test` job calls it on every push to main **and** every `v*` tag, so every main push still lints exactly once, `hand-lock` keeps its lock, and pull requests still lint through `lint.yml`'s `pull_request` trigger. On GitHub the same change removes the redundant second run; nothing GitHub relied on disappears. **Verified:** `actionlint` clean on `lint.yml` and `build-push.yml`. ### Not touched No version, no CHANGELOG release section, no release files — Hygiea's 0.6.2 release run is in flight beside this.
mcl-mail#19, #4: drop the two uncheckable repository links; lint once per main push
Some checks failed
c4 model / c4-model (pull_request) Has been cancelled
c4 model / c4-model-1 (pull_request) Has been cancelled
lint-and-test / check (pull_request) Has been cancelled
lint-and-test / The tested lock arrives whole (pull_request) Has been cancelled
0698535845
mcl-mail#19. Two documents named a repository the private scan cannot verify as
public, so check:private refused this tree. The scan's own guidance is keep the
reasoning, drop the link: README.md no longer points at the sponsors tracker for
the crew mail that is not built yet, and mailbox_status.hrl names evoq's
bit-flags guide without its owner, so the name stays (a private repository's
name in text is fine) and the cross-repository slug goes. Verified by running
martha's check:private against this tree: no "a repository that is not public"
hit, and neither line is named.

mcl-mail#4. Every forge push to main ran lint twice: once from lint.yml's own
push trigger, and once from build-push.yml's test job. Gating test the way its
siblings are gated would skip hand-lock with it, and hand-lock is the only job
that files the tested rebar.lock host00's signer fetches (it needs test's
outputs and success()), so the fix takes the other route the issue allows:
lint.yml keeps pull_request and workflow_call, and build-push's test job is the
one run covering every push to main and every v* tag. actionlint is clean on
both files.
build-push: the hand-lock comment stops claiming lint runs on its own (mcl-mail#4)
All checks were successful
c4 model / c4-model-1 (pull_request) Successful in 3s
c4 model / c4-model (pull_request) Successful in 0s
lint-and-test / check (pull_request) Successful in 3m59s
lint-and-test / The tested lock arrives whole (pull_request) Successful in 2s
26912cd6bb
The push trigger is gone from lint.yml, so this run is the only one that can file the tested lock; the comment beside hand-lock said otherwise.
terra manually merged commit 37f9a888b5 into main 2026-11-23 21:21:28 +00:00
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
macula-services/mcl-mail!20
No description provided.