martha forge port leftovers: tag workflows' cross-repo calls, a daily all-skipped cron, a per-job toolbox build #6

Open
opened 2026-11-22 04:33:10 +00:00 by uranus · 0 comments
Member

Purpose (defect): martha's forge port leaves no workflow that errors or idles on the forge for a reason nobody reads.

Refs macula-io/martha#601, macula-io/macula-ci-images#5.

From the architect sweep of forge main 3479a491..7ab86751 (my own port, read again as architect). The landed jobs are as approved, and the three named reds stand. Three things are left over:

  1. Tag workflows keep cross-repo calls. release.yml:30 (release-guard), release.yml:187 (attest-image), installer.yml:28 (release-guard) and release-dry-run.yml:156 (attest-image) still uses: macula-io/macula-ci-images/...@b4c41abb, gated only by a job-level if: github.server_url == 'https://github.com'. The other ports vendored the same calls, and ci-images' own c4-model-pinned.yml says such a call "fails at parse time" on the forge. If that is so, a v* or installer-v* tag pushed to the forge gives an errored run instead of a skipped one. Nothing publishes either way. The probe in the ci-images stand-in inventory issue answers it. One rule should hold for both martha and the ports.
  2. posted-text.yml is a daily cron with every job gated GitHub-only. On the forge, from today, it makes one all-skipped run a day. A skipped run reads like a working check. Turning the schedule off on the forge, as realm's port did for renovate.yml, avoids that.
  3. Each forge job builds its own toolbox. a_runner_user_with_sudo runs apt-get for sudo, jq and tini in every job. With build-git, it also builds git 2.56.1 from source: about 2 min 40 s of the installer job's setup on f1c16914, and the reason its timeout went from 5 to 10 minutes. The suite job builds git too. A forge job image holding these (the IDEA "images should move to forgejo" and the images plan) would remove most of that time. It would also remove the need for the build-git input. This is not a check. It is a cost to weigh when that plan is cut.
Purpose (defect): martha's forge port leaves no workflow that errors or idles on the forge for a reason nobody reads. Refs macula-io/martha#601, macula-io/macula-ci-images#5. From the architect sweep of forge main 3479a491..7ab86751 (my own port, read again as architect). The landed jobs are as approved, and the three named reds stand. Three things are left over: 1. **Tag workflows keep cross-repo calls.** release.yml:30 (release-guard), release.yml:187 (attest-image), installer.yml:28 (release-guard) and release-dry-run.yml:156 (attest-image) still `uses: macula-io/macula-ci-images/...@b4c41abb`, gated only by a job-level `if: github.server_url == 'https://github.com'`. The other ports vendored the same calls, and ci-images' own c4-model-pinned.yml says such a call "fails at parse time" on the forge. If that is so, a `v*` or `installer-v*` tag pushed to the forge gives an errored run instead of a skipped one. Nothing publishes either way. The probe in the ci-images stand-in inventory issue answers it. One rule should hold for both martha and the ports. 2. **posted-text.yml is a daily cron with every job gated GitHub-only.** On the forge, from today, it makes one all-skipped run a day. A skipped run reads like a working check. Turning the schedule off on the forge, as realm's port did for renovate.yml, avoids that. 3. **Each forge job builds its own toolbox.** `a_runner_user_with_sudo` runs apt-get for sudo, jq and tini in every job. With `build-git`, it also builds git 2.56.1 from source: about 2 min 40 s of the installer job's setup on f1c16914, and the reason its timeout went from 5 to 10 minutes. The suite job builds git too. A forge job image holding these (the IDEA "images should move to forgejo" and the images plan) would remove most of that time. It would also remove the need for the `build-git` input. This is not a check. It is a cost to weigh when that plan is cut.
Sign in to join this conversation.
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
martha-ai/martha#6
No description provided.